Today is 2026-11-12 Thursday,Welcome to this site 

Drinking Water Fluoride Remover Case

Xinguoying Water Plant in Woyang County, Bozhou City

Word:[Big][Middle][Small] Mobile page qrcode 2026/7/6     Viewed:    


Project Overview: The project is located in Woyang County, Bozhou City. Our company is responsible for the design, equipment selection, transportation, installation, commissioning, trial operation and training of the chemical defluoridation system of the Xinguoying Water Plant in Woyang County.

Project content: Material selection, supply, installation, commissioning, operation and training of fluoride removal equipment

Water treatment capacity: 80 tons/hour

Raw water quality: F-: 2.20mg/L

Product water quality: F-: 0.80mg/L


亳州市涡阳县新郭营水厂

Go Back
Print
4008-698-498
Wechat QR code