Today is 2026-11-12 Thursday,Welcome to this site 

Drinking Water Fluoride Remover Case

Fluoride and iron and manganese removal equipment at Wanghai Water Plant in Yingdong District, Fuyang City

Word:[Big][Middle][Small] Mobile page qrcode 2026/7/6     Viewed:    

Project overview:The project involves Huayuan Village, Honggou Village, Raohai Village and Hongyang Village in Kouzi Town; Wanghai Village, Xiangyang Village, Miaobei Village, Zhaozhuang Village and Lituqiao Village in Laomiao Town; Zhangmiao Village, Chengwei Village and Tianlou Village in Zhongwu Town, a total of 3 towns and 12 administrative villages, solving the problem of unsafe drinking water for 50,000 rural residents and 4,080 school teachers and students. Our company is responsible for the design, equipment selection, transportation, installation, commissioning, trial operation and training of the fluoride, iron and manganese removal, and disinfection systems for the Huayuan Water Plant in Kouzi Town, Wuzhai Water Plant in Zhongwu Town, and Wanghai Water Plant in Laomiao Town.

Project work:Design, equipment and material selection, supply, installation and commissioning of fluoride and iron and manganese removal systems

Processing water volume:90 tons/hour

Raw water quality:Fluorine: 2.25mg/L, Iron: 1.65mg/L, Manganese: 0.26mg/L

Product water quality:Fluorine: 0.05mg/L, Iron: <0.05mg/L, Manganese: <0.01mg/L


Acceptance of fluoride and iron and manganese removal equipment at Yingdong Wanghai Water Plant

Go Back
Print
4008-698-498
Wechat QR code